The Zambia Riverside Solar Power Station is a 34 megawatts solar power plant in Zambia. The privately owned solar farm was originally commissioned in April 2018, as a 1 MW power station by Copperbelt Energy Corporation (CEC), who own the energy infrastructure. In December 2021, CEC signed an engineering, procurement, and construction (EPC) con. The 1 MW power station was located on a piece of property measuring 1.1 hectares (2.7 acres), adjacent to the main. In April 2018, CEC commenced commercial use of its 1 MW solar power station in Kitwe, as an income-diversification enterprise. In December 2021, CEC contracted Sinohydro to expand the solar farm to 34 MW,. The construction costs for the expansion are reported as US$19.2 million, paid by CEC. Construction is expected to last approximately one year and conclude during the fourth quarter of 2022. In February 2023, the completed 34 MW solar farm was officially commissioned in the presence of, the Zambian Head of State. The new installation sits of 30 hectares (74 acres). Its annual output. • • • • As of 22 November 2022.
[PDF Version]